Archived Documents
- 79th Street Corridor Neighborhood Initiative (79th Street Corridor Neighborhood Initiative)
- 79th Street Corridor Redevelopment Plan, December 2003
- 79th Street Corridor Redevelopment Plan Data and Research Summary Report draft, November 2002 (print only)
- 79th Street Corridor Redevelopment Plan presentation, December 2003
- 79th Street Corridor Redevelopment Plan Transportation Analysis Draft Report, September 2002
- 107th Avenue Pedestrian Transit Greenways Corridor at City of Sweetwater Final Report, December 2003
- 137th Avenue Corridor Study
- 2040 Southeast Florida Regional Transportation Plan, October 2015
- A Feasibility Study on the Joint Utilization of Transportation Services Between the Metropolitan Transit Agency andthe Dade County Public School System Final Report, June 1978
- A Major Highway Plan for Metropolitan Dade County Florida, December 1956
- Access to SW 137th Avenue to and from SR-874 Study
- Access to SW 137th Avenue to and from SR 874 (Don Shula Expressway) Executive Summary, April 2002
- Access to SW 137th Avenue to and from SR 874 (Don Shula Expressway) Final Report, April 2002
- Aerial Cable Transit (ACT) Feasibility Study
- Aerial Cable Transit Feasibility Study Final Report, February 2016
- Aerial Cable Transit Feasibility Study Final Report Appendices, February 2016 (print only)
- Aerial Tramway Circulators for Public Transport, March 2004
- Aerial Tramway People Mover MIC-MIA Connector, March 2002
- Aesthetic Guidelines for Transportation Projects in Miami-Dade County
- Aging Road Users Strategic Safety Plan
- Airport Area Multimodal Access Study
- Application of CMP Strategies in Miami-Dade County
- Applications of Innovative Strategies to Improve Bicycle Safety and Mobility, August 2014
- Arterial Grid Network Analysis
- Arterial Grid Network Analysis Phase II
- Automated Bicycle Rental System and Parking Plan Study 2011
- Aventura-Ojus Mobility and Access Study
- Bay Link (Miami-Miami Beach Transportation Corridor Study)
- Bay Link Miami-Miami Beach Transportation Corridor Study Supplemental DEIS Capital Coast Methodology (Draft), March 2002
- Bay Link Miami-Miami Beach Transportation Corridor Study Supplemental DEIS Conceptual Alternatives (Draft), March 2002
- Bay Link Miami-Miami Beach Transportation Corridor Study Supplemental DEIS Locally Preferred Alternative Report, February 2003
- Bay Link Miami-Miami Beach Transportation Corridor Study Supplemental DEIS Technology Assessment (Draft), March 2002
- Bay Link Miami-Miami Beach Transportation Corridor Study Supplemental Draft Environmental Impact Statement (DEIS) Volume 1, October 2002
- Scope of Work for the Miami-Miami Beach Transportation Corridor Study, June 2001
- Bay Link Phase 2 (Miami-Miami Beach Transportation Corridor Study)
- Bay Link Miami-Miami Beach Transportation Corridor Study (Phase 2) Capital Cost Estimating Methodology Technical Memorandum, December 2004
- Bay Link Miami-Miami Beach Transportation Corridor Study (Phase 2) Financial Plan, November 2004
- Bay Link Miami-Miami Beach Transportation Corridor Study (Phase 2) Locally Preferred Alternative Report, September 2004
- Bay Link Miami-Miami Beach Transportation Corridor Study (Phase 2) New Start Criteria Report, September 2004
- Bay Link Miami-Miami Beach Transportation Corridor Study (Phase 2) Operations Plan; Operating & Maint. Cost Estimating, December 2004
- Bay Link Miami-Miami Beach Transportation Corridor Study (Phase 2) Preliminary Engineering Scope of Services, September 2004
- Bay Link Miami-Miami Beach Transportation Corridor Study (Phase 2) Updated Public Involvement Plan, September 2004
- Beach Corridor Transit Connection Study
- Beach Corridor Project Development Study TIGER VI Project Planning Grant Application, April 2014
- Beach Corridor Transit Connection Study Final Report, June 2015
- Beach Corridor Transit Connection Study PEC Meeting Presentations (Appendix C), June 2015
- Beach Corridor Transit Connection Study Project Executive Committee (PEC) Meeting presentation, July 2014
- Beach Corridor Transit Connection Study Project Executive Committee (PEC) Meeting presentation, January 2014
- Beach Corridor Transit Connection Study Project Executive Committee (PEC) Meeting presentation, April 2014
- Bicycle and Pedestrian Plan Update, 4/2009
- Bicycle and Pedestrian Mobility Plan for the City of Miami Gardens (City of Miami Gardens Bicycle/Pedestrian Mobility Plan)
- Bicycle and Pedestrian Mobility Plan for the City of Miami Gardens Executive Summary, April 2013
- Bicycle and Pedestrian Mobility Plan for the City of Miami Gardens, April 2013
- Bicycle and Pedestrian Traffic Count Program, May 2008
- Bicycle Parking Plan for Miami-Dade Transit
- Bicycle Project Feasibility Evaluation, November 2002
- Bicycle Safety Program Plan
- Bicycle Wayfinding Study
- Bicycle/Pedestrian Mobility Plan for the Miami Downtown Development Authority Area, March 2011
- Bicycle/Pedestrian Safety Plan Update, April 2014
- Bike Friendly Miami-Dade Program Report, August 2017
- Bikes-On-Bus Service Delivery in Dade County: Suitability and Feasibility, April 1995 (print only)
- BikeSafe Final Report, October 2010
- Biking to Work in Miami: The Complete Guide to Commuting by Bicycle in the Miami Area, August 1982
- Black Creek Trail Segment B Study
- Building the Transportation System of the Future: Summary of Major Activities 1997-1998
- Bus Rapid Transit (BRT) Implementation Plan along Transit Corridors
- Bus Rapid Transit Opportunities Study
- Overview of Bus Rapid Transit Opportunities as Part of an Integrated Multi-modal Strategy to Alleviate Traffic Congestion Technical Memorandum 1, October 2004
- Overview of Bus Rapid Transit Opportunities as Part of an Integrated Multi-modal Strategy to Alleviate Traffic Congestion Technical Memorandum 2, February 2005
- Overview of Bus Rapid Transit Opportunities as Part of an Integrated Multi-modal Strategy to Alleviate Traffic Congestion Technical Memorandum 3, April 2005
- What is BRT? Transportation Committee Meeting Presentation, July 2004
- Bus-on-Shoulder Service Evaluation Study
- Central Dade Transport Zone Study 2007
- Citizen's Guide to Transportation studies (Pocket Guides)
- On the Move.. Miami-Dade County Pocket Guide to Transportation, Summer 2004
- En Marcha.. Guia de transporte del condado Miami-Dade, Verano (Pocket Guide in Spanish) 2007
- On the Move.. Miami-Dade County Pocket Guide to Transportation, Summer 2007
- Sou Movman.. Ti Liv Ki Bay Enfomasyon Sou Zafe Transpotasyon Nan Miyami Ded Konty, Sezou (Pocket Guide in Haitian Creole) 2007
- City of Aventura Municipal Transit Study, June 1998
- City of Aventura Municipal Public Transit Study Phase III: Transit Enhancement, Expansion and Improvement Plan, November 2002
- City of Aventura Unified Master Plan for Pedestrian and Bicycle Connectivity, April 2017
- City of Coral Gables Circulator System Study
- City of Coral Gables Trolley Master Plan
- City of Doral FIU Trolley Expansion Route Feasibility Study, November 2018
- City of Doral Transit Mobility Plan
- City of Doral Transportation Master Plan
- City of Doral Transportation Master Plan Update 2010
- City of Hialeah Circulator Study, 10/1998
- City of Homestead Downtown Area Transportation Plan Update
- City of Homestead Downtown Area Transportation Plan Update Study Advisory Committee Meeting #1, July 2004
- City of Homestead Downtown Area Transportation Plan Update Technical Memorandum 1: Study Area Definition, May 2004
- City of Homestead Downtown Area Transportation Plan Update Technical Memorandum 2: Public Participation, June 2004
- City of Miami Baywalk Mobility Plan, May 2013
- Miami Beach Middle Beach Recreational Corridor Phase III Final Report, June 2016
- City of Miami Beach Municipal Mobility Plan
- City of Miami Beach Municipal Mobility Plan Existing Conditions Report, Future Conditions Report, Special Users Report, and Ten-Year Plan, December 1998
City of Miami Beach Municipal Mobility Plan Implementation Study Executive Summary 1999
City of Miami Beach Municipal Mobility Plan Vision Statement 1998
- City of Miami Beach Municipal Mobility Plan Existing Conditions Report, Future Conditions Report, Special Users Report, and Ten-Year Plan, December 1998
- City of Miami Car-Sharing Feasibility Study
- City of Miami Gardens Transportation Master Plan
- City of Miami Springs 36th Street District Traffic Impact Study, April 2009
- City of North Miami Beach Community Mobility Program
- City of North Miami Beach Fulford City Center Geometric Roadway Design, April 2003
- City of North Miami Beach MPO Municipal Grant Circulator Services End of Year Report, September 1998
- City of North Miami Beach Pedestrian and Bicycle Safety Analysis, December 2004
- City of North Miami Bike, Park and Ride Study
- City of South Miami Hometown Intermodal Transportation Study
- City of South Miami Intermodal Transportation Plan Final, January 2015
- City of South Miami Trolley/Circulator Feasibility Study
- City of South Miami US-1 Pedestrian Overpass Study (Revised), July 2000
- City of Sunny Isles Beach Feasibility Study Summary of a Bridge to Link a Pedestrian/Bicycle Greenway, September 2004 (City of Sunny Isles Bridge to Link a Pedestrian/Bicycle Greenway Study)
- City of West Miami Citywide Traffic Study, May 2020
- Civic Center TMO Commuter Characteristics Study
- Climate Resiliency Study
- Coastal Communities Transportation Master Plan Final Report, August 2007
- Compare Transit Survey Results to Actual Count Data, September 2010
- Complete Streets for Corridors with Bicycle/Pedestrian Gaps on the State Highway System, May 2022
- Complete Streets Manual, June 2014 (Complete Streets Case Study)
- Comprehensive Parking Study for Freight Transport in Miami-Dade County, September 2010
- Congestion Intersection Improvement Study Phase II
- Congestion Management Process (CMP) Update
- Congestion Management System (CMS) Update Study
- Connected Autonomous Vehicle Strategic Plan
- Connecting NW 25th Street to the HEFT Study
- Connecting the Highways Network Missing Links Final Report, December 2017
- Connector Route to Miami International Airport Economic Study, June 1965
- Controversial Corridors Review: Recommended Transportation Alternatives, October 1974
- Coral Gables Bicycle & Pedestrian Stress Assessment Final Report, April 2019
- Coral Gables Bicycle/Pedestrian Master Plan, April 2014
- Coral Gables Trolley Route Expansion Study
- Countermeasures for Bicycle/Pedestrian High Crash Locations
- Countywide Bus Access and Transfer Facility Assessment
- Countywide GIS Web-based Crash Data Analysis System Summary Report, 2015 (Countywide Traffic Safety Program)
- Countywide Parking Policy Study for Miami-Dade County
- Countywide Parking Policy Study for Miami-Dade County Executive Summary Report, October 1999
- Countywide Parking Policy Study for Miami-Dade County Final Report, August 1999
- CSX East-West Rail Feasibility Study
- Curtiss Parkway/NW 36 Street Traffic Study, May 2006
- Dade County Continuing Development of TMAs
- Dade County Continuing Development of TMAs: Civic Center Pedestrian Amenities and Safety Study, September 1994
- Dade County Continuing Development of TMAs: Civic Center Pedestrian Amenities and Safety Study Executive Summary, May 1994
- Dade County Continuing Development of TMAs: Investigation of Alternative TMAs, October 1994
- Dade County Continuing Development of TMAs: South Beach Bicycle and Pedestrian Study, January 1995
- Dade County Park & Ride Lot Plan
- Dade County Park & Ride Lot Plan Justification Report: North Dade County, NW 27th Avenue Corridor Park and Ride Lots 1993
- Dade County Park & Ride Lot Plan Justification Report: Northeast Dade County, Biscayne Boulevard Corridor Park and Ride Lots 1993
- Dade County Park & Ride Lot Plan Justification Report: South Dade, South Dixie Highway Busway Park And Ride Lots 1993
- Dade County Park & Ride Lot Plan Justification Report: West Dade County Corridor Park and Ride Lots 1993
- Dade County Transit Development Program (SIMCUR-192), September 1973
- Dade County Transit Ridership Study, October 1975
- Dadeland Regional Activity Center Study
- Developing Procedures, Criteria and Evaluation for Establishing School Crossing Guard Locations, August 2012
- Development of a Service Plan for Waterborne Transportation Services in Miami-Dade County
- Development of a Service Plan for Waterborne Transportation Service in Miami-Dade County Executive Summary, December 2004
- Development of a Service Plan for Waterborne Transportation Service in Miami-Dade County Final Report, December 2004
- Development of a Service Plan for Waterborne Transportation Service in Miami-Dade County presentation 2005
- Doral Boulevard Access Management Study Report, December 2021
- Doral Circulator Study Final Report, May 2007
- Doral Trolley/SMART Plan Coordination Study
- Douglas Road Transit Corridor Study Final Report, May 2014
- Downtown Government Center Master Plan, May 1976
- Downtown Kendall Transportation Study Final Submittal, March 2002
- Downtown Miami Bus Lanes Study (Bus Only Lanes in Downtown Miami)
- Enhancing Safe Routes to School Program Along the South Dade Trail Feasibility Study
- Everglades Bike Trail System Study Phase One Corridor Study, Part One Preliminary Alternatives, June 1989
- Feasibility of Implementing Direct Transit Service Connecting Miami International Airport with PortMiami (Miami International Airport to PortMiami Direct Transit Connection Study)
- Feasibility of Implementing Direct Transit Service Connecting Miami International Airport with PortMiami Executive Summary, September 2025
- Feasibility of Implementing Direct Transit Service Connecting Miami International Airport with PortMiami Fact Sheet, September 2025
- Feasibility of Implementing Direct Transit Service Connecting Miami International Airport with PortMiami Final Report, September 2025
- Federal Certification 2015
- 2015 Federal Certification Approval Letter of August 31, 2015
- 2015 Federal Certification Report for the Miami Urbanized Area Transportation Management Area (final) signed on October 30, 2015
- 2015 Federal Certification Announcement Letter of March 13, 2015
- 2015 Federal Certification Site Visit Agenda
- 2015 Federal Certification Newspaper Advertisement
- 2015 Federal Certification Public Meeting Advertisement Flyer posted at Public Libraries
- 2015 Federal Certification Facebook Page Announcement (Facebook)
- 2015 Federal Certification Press Release of April 8, 2015
- 2015 Federal Certification Opening presentation video of April 22, 2015 in PDF
- 2015 Federal Certification Support Documentation with Exhibits (omnibus)
- 2015 Federal Certification Support Documentation
- 2015 Federal Certification Exhibits
- 2015 Federal Certification Document Public Meeting Presentation of April 22, 2015
- Federal Certification 2019
- Florida's High Speed Rail Study, September 1984
- Florida High Speed Transportation System (FHSTS) Proposal Chapter I: Business Entity Information and Applicant Qualifications, October 1995
- Florida High Speed Transportation System (FHSTS) Proposal Chapter II: Florida's Travel and Transportation Market, October 1995
- Freight Plan Update 2024
- General Assembly 2018
- General Assembly Program Booklet
- General Assembly Executive Summary
- General Assembly TPO Annual Report 2017 by Aileen Bouclé
- General Assembly MTA Hudson Yards Transit Oriented Development presentation by Robert Paley
- General Assembly ARC's Regional Role in Transit Oriented Development presentation by Douglas Hooker
- General Assembly The Tale of Three Cities: Connectivity and Livability presentation by Meg Daly
- General Assembly Transit and Rail Innovative Funding and Finance Update presentation by Sasha Page
- General land use masterplan: Metropolitan Dade County, Florida
- Health District Bicycle and Pedestrian Mobility Plan, January 2012 (City of Miami Health District Bicycle and Pedestrian Mobility Study)
- High Speed Rail Task Force Report, November 1986
- The Historical Impacts of Transportation Projects in the Overtown Community, March 1998
- HOV Conceptual Design Study Interim Report #1: South Dade, Palmetto and East-West Expressways, July 1985
- HOV Conceptual Design Study Interim Report #2: South Dade, Palmetto and East-West Expressways, December 1985
- I-95 HOV Systems Plan Phase II System-wide Operations Study Technical Memorandum #1: Data Analysis, May 2002 (draft)
- Industry Forum 2023
- Industry Forum 2025
- Little Havana Bicycle/Pedestrian Mobility Plan, June 2016 (City of Miami Little Havana Bicycle/Pedestrian Mobility Study)
- Local Option Gas Tax Expenditure Report, February 1996
- Metro-Dade Bicycle Facilities Plan
- Miami-Dade 2040 Bicycle/Pedestrian Plan, 2014 (Countywide Bicycle/Pedestrian Plan)
- Miami-Dade Bicycle & Pedestrian Data Collection, June 2018
- Miami-Dade County Bicycle Boulevard Planning Study
- Miami-Dade County Compendium of Transportation Facts & Trends
- Miami-Dade County Freight Plan Update (Countywide Freight Plan)
- Miami-Dade County Freight Plan Update, August 2014
- Miami-Dade County Freight Plan Update presentation to FTAC, August 2014
- Miami-Dade County Freight Plan Update
- Miami-Dade CSX Corridor Evaluation Study
- Miami-Dade CSX Corridor Evaluation Study Final Report, August 2009
- Miami-Dade CSX Corridor Evaluation Study Kick-off Community Meeting presentation, January 2009
- Miami-Dade Countywide Consolidated Park-and-Ride Facilities Plan, December 2010 (Countywide Park and Ride Facilities Study)
- Miami: 3 Proposals for Downtown, September 1970
- Miami Freedom Park Multimodal Connectivity and Accessibility Study Fact Sheet, December 2025
- Miami Regional Intermodal Plan (MRIP) Summary Report, January 2014 (City of Miami Regional Intermodal Plan)
- Miami Springs Westward Drive Arterial Qualitative Assessment Report, January 2011 (City of Miami Springs Traffic Circulation and Parking Study for Westward Drive)
- Miami Urban Area Transportation Study (MUATS 1985)
- Miami Urban Area Transportation Study Commercial Model Development for Transportation Planning, November 1968
- Miami Urban Area Transportation Study Status Report (for the Year 1985) Book 1, March 1968
- Miami Urban Area Transportation Study Status Report (for the Year 1985) Book 2, March 1968
- Miami Urban Area Transportation Study Status Report (for the Year 1985) Book 4, March 1968
- Miami Urban Area Transportation Study Status Report (for the Year 1985) Book 5, March 1968
- Miami Urban Area Transportation Study Status Report (for the Year 1985) Book 6, March 1968
- Miami Urban Area Transportation Study The Principal Street & Highway Plan 1985: A Summary Report, April 1969
- Proposed Transportation Master Plan for Dade County: A Summary, February 1969
- MPO Nationwide Survey, August 2002
- NE 125th Street Multimodal Improvements, February 2016 (City of North Miami Downtown Multimodal Traffic Circulation Plan)
- Orange Line Phase 2: North Corridor Metrorail Extension New Starts Financial Plan, September 2007
- North/Middle Beach Transit Study, August 2013
- Northwest 27th Avenue Origin-Destination Study On-Board and Telephone Surveys, March 1990
- Overtown/Wynwood Bicycle Pedestrian Mobility Plan, 9/2014 (City of Miami Overtown and Wynwood Bicycle/Pedestrian Mobility Plan)
- People Mover Technology as an Option to Further Extend the Reach of the SMART Program Study
- Prospectus for Transportation Improvements (Draft), June 1977
- Proposed Dade Bikeway Plan, April 1972
- Proposed Transportation Master Plan For Dade County: A Summary, February 1969 (M.U.A.T.S. 1985)
- Rapid Transit System Preliminary Engineering Final Project Report, March 1979
- Recommended 1985 principal street and highway plan: Miami area transportation study (Map)
- Safe Streets Summit 2024 Program Booklet
- Safe Streets Summit 2024 Welcome Presentations
- Safety Studies at High Crash Locations Countywide (Countywide High-Crash Location Safety Study)
- SMART MAP 2050 Bicycle-Pedestrian Master Plan Executive Summary, September 2024
- SMART MAP 2050 Bicycle-Pedestrian Master Plan Projects, September 2024
- SMART STEP TPO Urban and Non-Urban Mobility Task Force Program Evaluation, June 2024
- SMART Trends Transportation Summit 2022
- SMART Trends Transportation Summit Final Report
- SMART Trends Transportation Summit FHWA Presentation: New Federal Bipartisan Infrastructure Law-Safe and Equitable Transportation
- SMART Trends Transportation Summit Keynote Speaker Presentation by Jared W. Perdue, P.E., FDOT Secretary
- SMART Trends Transportation Summit Miami-Dade Ports & Economic Forum Presentation
- SMART Trends Transportation Summit Panel - Infrastructure Investment & The Economy Presentation
- SMART Trends Transportation Summit Policy Programs & Funding Part 1: State & Federal Discussion Presentation
- SMART Trends Transportation Summit Program Booklet
- SMART Trends Transportation Summit Transit Oriented Development Presentation
- SMART Trends Transportation Summit Transportation Trends Presentations
- South Miami Complete Streets Policies and Design Manual, May 2016 (City of South Miami Pedestrian Safety and Mobility Infrastructure Implementation Plan)
- South Miami Intermodal Transportation Study, June 2001
- State of Florida Air Implementation Plan, January 1972
- Summary of Studies 2002
- S.W. 120th Street Interchange with the Homestead Extension of Florida's Turnpike Preliminary Engineering Report, June 1985
- Town of Cutler Bay Complete Streets Corridor Analysis Exhibit "A", August 2017
- Town of Cutler Bay Bicycle & Pedestrian Master Plan, August 2011 (Cutler Bay Town-Wide Bicycle and Pedestrian Master Plan)
- Transit Development Program Interim Report 7 (SIMCUR-768-7), January 1972
- 1984 Transportation Disadvantaged Development Plan
- Transportation Enhancements Program 1999
- Transportation Improvement Program (TIP)
- 1978 Transportation Improvement Program
- 1979 Transportation Improvement Program
- 1980 Transportation Improvement Program
- 1981 Transportation Improvement Program
- 1983 Transportation Improvement Program
- 1984 Transportation Improvement Program
- 1986 Transportation Improvement Program
- 1990 Transportation Improvement Program
- 1993 Transportation Improvement Program
- 1996 Transportation Improvement Program
- 1997 Transportation Improvement Program
- 1999 Transportation Improvement Program
- 2000 Transportation Improvement Program
- 2001 Transportation Improvement Program
- 2002 Transportation Improvement Program
- 2003 Transportation Improvement Program
- 2004 Transportation Improvement Program
- 2005 Transportation Improvement Program
- 2006 Transportation Improvement Program
- 2007 Transportation Improvement Program
- 2008 Transportation Improvement Program
- 2009 Transportation Improvement Program
- 2010 Transportation Improvement Program
- 2011 Transportation Improvement Program
- 2012 Transportation Improvement Program
- 2013 Transportation Improvement Program
- 2014 Transportation Improvement Program
- 2015 Transportation Improvement Program
- 2016 Transportation Improvement Program
- 2017 Transportation Improvement Program
- 2018 Transportation Improvement Program
- 2019 Transportation Improvement Program
- 2020 Transportation Improvement Program
- 2021 Transportation Improvement Program
- 2022 Transportation Improvement Program
- 2023 Transportation Improvement Program
- 2024 Transportation Improvement Program
- 2025 Transportation Improvement Program
- 2026 Transportation Improvement Program
- Transportation Improvement Program (TIP) Citizens Version
- Transportation Plan For Metropolitan Dade County, Florida, Long Range Element Final Report, April 1979
- Trends in Metropolitan America, February 1977
- 2000 Up-Date Supplemental Report S-1: Recommended Staging Of Implementation, December 1978
- US-1 Bicycle and Pedestrian Bridge Feasibility Study
